Dates to stop CNS due to the replacement of the Network devices (July, August)
CNS network devices will be replaced according to the end of the lease term.
Therefore the network will be shutdown on the dates scheduled below so please take care.
Any changes such as the schedule will be informed on this page.
- All Network devices at SFC Campus will be shutdown on the dates below. (excluding τ-building 2F-3F, NMC-building, and Junior & Senior High Schools.)
- Servers in SFC-ITC will not be suspended, so CNS services (e.g. e-mail,Web, Shared Workd Space, VPN Connection,WiMax etc.) will be available.
- Please note that some workers will enter the design studio and other shared space where network devices are placed in order to replace them.
Also please be aware that any goods which is left near those devices has a possibility of being removed tenporality.
Thank you for your patience and understanding.
Last-Modified: July 1, 2016
The content ends at this position.