Schedule for replacement of CNS WiFi network devices (August, 2021)
(Released: July 8, 2021 1:00p.m.)
(Modified: July 20, 2021 9:00a.m.)
We will be replacing the CNS wireless network equipment as follows.
As a result, CNS wireless network (WiFi) services will be suspended temporarily.
If there is any change in the schedule, we will update this page.
- Shonan Fujisawa Junior and Senior High School network equipment will not be affected.
- CNS wireless network equipment will be unavailable throughout the affected buildings. The wired network will not be suspended.
- Server equipment hosted by ITC will not be stopped, so other CNS services (e-mail, Web, shared work area, VPN connection, etc.) will not be stopped unless otherwise notified.
- Workers will enter the location where the equipment is installed to replace devices. Please note that if any items are placed around the installation site, they may be temporarily moved.
| Year | Month | Day | Target (Building) | Detail |
|---|---|---|---|---|
| 2021 | August | 3(Tuesday/Summer Break) | k(kappa) Research building | CNS wireless network will be unavailable the entire day. (CNS/CNS3/keiomobile2/eduroam...) |
| 4(Wednesday/Summer Break) | e(epsilon) Research building | |||
| 5(Thursday/Summer Break) | i(iota) Research building | |||
| 6(Friday/Summer Break) | o(omicron) Research building Delta building |
|||
| 7(Saturday) | L(lambda) Research building L(lambda) Lecture building |
|||
| 8(Sunday) | e(epsilon) Lecture building o(omicron) Lecture building Tau building |
|||
| 9(Monday/Holiday) | k(kappa) Lecture building i(iota) Lecture building Tau building |
|||
| 11(Wednesday) | Omega building Gamma(gym) building |
|||
| 12(Thursday) | Omega building Sigma building Lounge(Subway) |
|||
| 13(Friday) | Theta building Nu-(ABCDE) Guesthouse |
|||
| 14(Saturday) | Theta building Phi/Psi (Clubhouse) |
|||
| 15(Sunday) | Mu(Media Center) | |||
| 17(Tuesday) | Beta Village | |||
| 18(Wednesday) | Beta Village | |||
| 22(Sunday) | A(alpha) building NMC building |
|||
| 23(Monday) | Beta Village | |||
| 25(Wednesday) | Beta Village | |||
| 29(Sunday) | (alpha) building NMC building |
|||
| September | Undecided (1st or 2nd) |
Zeta building |